Select Tool
Switch between the Fire Door Inspection tool and the Fire Risk Assessment tool. Both tools share the same active project.
Project Dashboard
Combined Fire Door Inspection and Fire Risk Assessment status across all projects on this device.
| Project |
Door Records |
Open Door Defects |
Fire Hazard Rating |
Fire Safety Rating |
Open FRA Actions |
Next FRA Review |
Project Management
JRS Fire Consultancy
Asset Entry & QR Capture
Optional Door ID, location, GPS and QR tools
Open
Camera scanner unavailable offline or without HTTPS
Idle
Offline Cached Ledger
| Select |
Door ID |
Type |
Status |
Evidence |
Actions |
Preview opens in a new tab so you can review the report before saving the final PDF.
General Information
Premises address, inspection date and responsible person are shared with the Project Management panel above.
Premises Profile
Exit Capacity
Record each available exit with its measured clear width to support the maximum occupancy calculation.
| Floor |
Exit / Location |
Clear Width (mm) |
|
People at Risk
Identify everyone who may be affected by fire, including anyone who may need assistance to evacuate.
PEEP Register
Record an individual Personal Emergency Evacuation Plan entry for each named person or group who needs evacuation assistance.
| Person / Group |
Location |
Support Needs |
Evacuation Method |
Responsible |
Review Date |
|
Fire Hazards Assessment
Consider anything that could start a fire (ignition sources) and anything that could feed it (fuel sources).
Fire Safety Measures
Evaluate means of escape, detection and warning, firefighting equipment, and emergency lighting/signage.
Compartmentation Assessment
Assess fire-resisting construction that divides the building and limits fire spread.
Fire Safety Management & Training
Record, plan and train: management arrangements, resident/staff information, and training records.
Action Plan
Record significant findings and recommended actions, with a priority, target date and responsible person.
| Location |
Finding |
Recommended Action |
Priority |
Target |
Responsible |
Status |
|
Review, Rating & Sign-off